How to Do Goods Receipt? A Four-Step Check, Types of Deviations, the Monetary Value of a Deviation, the Receipt Record, a Supplier-Based Deviation Table and the Cost of the Check Training
How is goods receipt done? A four-step check, types of deviations, the receipt record and the supplier-based deviation rate: an 8-lesson guide with examples.
Contents 14 sections
- What will you be able to do by the end of this training?
- Lesson 1: What is goods receipt and why should it be done the same day?
- Lesson 2: How is the four-step goods receipt check done?
- Lesson 3: What are the types and distribution of deviations?
- Lesson 4: What is the monetary value of a deviation and the difference the check makes?
- Lesson 5: How is the goods receipt record kept?
- Lesson 6: How is a supplier-based deviation table built?
- Lesson 7: What are the cost and timing of the check?
- Lesson 8: How is goods receipt monitored?
- What are the most common mistakes in goods receipt?
- How does NetKasam make goods receipt tracking easier?
- Mini quiz: Test what you have learned
- Conclusion: Let every package pass through a gate before it enters the warehouse
- Frequently Asked Questions About Goods Receipt
The moment a package from a supplier enters the warehouse, two things happen: the product becomes your responsibility and the clock on your right to object starts running. If the quantity is short, the product arrives damaged or a product that was not in the order comes out of the package, noticing it right away is the easiest way to get a correction or return from the supplier. The same problem noticed weeks later, through a customer complaint or an inventory count difference, most often turns into your own loss. Goods receipt is the small but decisive checking step that creates this difference.
This article is not a narrative but an 8-lesson practical training. We will answer the question how to do goods receipt through a sample business that receives 80 supplier shipments a month: the four steps of goods receipt, the types and distribution of deviations, the monetary value of a deviation, the difference between checked and unchecked receipt, the right record layout, the supplier-based deviation table, the cost of the check and monitoring indicators. At the end there is a mini quiz and an answer key. All figures are sample values chosen to show the method; follow the same steps with your own data.
What will you be able to do by the end of this training?
In short: You will check incoming goods in four steps, record deviations by type, calculate the loss, compare your suppliers by deviation rate and defend the cost of the check itself with numbers.
- 01MatchCompare the waybill with the purchase order.
- 02CountCount the packages and units and tie them to the waybill.
- 03InspectCheck the condition and correctness of the product.
- 04RecordEnter the accepted quantity into inventory and the deviation into the deviation record.
- 05NotifyNotify the supplier in writing the same day.
- 06MeasureMonitor the supplier-based deviation rate.
The 8 lessons of the training: (1) what goods receipt is and why it should be done the same day, (2) the four-step check, (3) types and distribution of deviations, (4) the value of a deviation and the difference the check makes, (5) the record layout, (6) the supplier-based deviation table, (7) the cost and timing of the check, (8) monitoring indicators.
Lesson 1: What is goods receipt and why should it be done the same day?
In short: Goods receipt is the moment the delivered product is verified against the order. If it is not done the same day, the evidence of deviation and the objection period are lost.
Once the carrier drops off the package and leaves, proving that it is short or damaged often turns into a matter of interpretation between you and the supplier. If the package is put on shelves without being opened, you cannot tell who caused the damage or whether it was damaged in shipping or in the warehouse. A finding made against the person delivering at the moment of receipt, however, is a written report: package count, outer damage, shortage found on opening. Even though the supplier is not obliged to accept this report, it carries a documented objection.
There is also inventory accuracy. A product that enters inventory without goods receipt appears in the system at the ordered quantity; if less actually arrived, system inventory is overstated and orders that cannot be fulfilled appear in the following days. These unfulfilled orders are the source of the "in the system, not on the shelf" group among the missing-line reasons in the article how to measure order fulfillment rate. When a difference appears between the inventory record and physical inventory, see the article how to find and close inventory differences for the method.
Lesson 2: How is the four-step goods receipt check done?
In short: Match the order and waybill, count, inspect the product and record the result. Each of the four steps catches a different type of deviation.
| Step | What is checked? | Which deviation does it catch? |
|---|---|---|
| 1. Match | Are the product and quantity on the waybill the same as on the purchase order? | Wrong product, product not in the order |
| 2. Count | Do the package count and the units in each package match the waybill? | Short or excess quantity |
| 3. Inspect | Outer damage, product condition, expiry or serial information | Damaged and defective product |
| 4. Record | Accepted quantity and deviation record | Difference between record and physical inventory |
A practical rule: do a full count on deliveries from high-value suppliers or those with frequent deviations, and sampling for reliable suppliers. For sampling, a share is picked from each package or each product item, and if a deviation shows up you move to a full count. The unit in which the quantity difference is counted must also be written down; units per package and the pallet and package counts are kept in the same table. The article how to do an inventory count can be used for counting and record discipline. To reduce counting errors by scanning barcodes, see the article how to set up a barcode system.
Lesson 3: What are the types and distribution of deviations?
In short: Deviations appear in four types: short quantity, excess quantity, damaged product and wrong product. Whichever dominates determines which measure you choose.
In the sample business, 80 shipments and a total of 1,600 order lines arrive each month (an average of 20 lines per shipment). At goods receipt, 128 lines show a deviation, so the deviation rate is 128 ÷ 1,600 = 8.0%:
| Deviation type | Line | Share |
|---|---|---|
| Missing units | 64 | %50,0 |
| Damaged or defective product | 32 | %25,0 |
| Extra units | 16 | %12,5 |
| Wrong product | 16 | %12,5 |
| Total | 128 | %100 |
- Short quantity₺6450%
- Damaged or defective₺3225%
- Excess quantity₺1612.5%
- Wrong product₺1612.5%
Prepared with sample values. Equal to the total of 128 lines with deviations.
An excess quantity is also a deviation: if the extra product is not recorded, an inventory difference arises, while the invoice comes at the ordered quantity; the supplier may later ask for the extra shipment back. Short quantity is the most common deviation, at more than half; this is because the quantity on the waybill shows the ordered quantity and whether the package actually contains it can only be understood by counting. To track the source of deviations at the supplier level, use this table together with the indicators in the article how to measure supplier performance.
Lesson 4: What is the monetary value of a deviation and the difference the check makes?
In short: The cost value of the 128 lines with deviations is ₺192,000. With a check at receipt, 90% is corrected; with unchecked receipt, only 30%.
In the example, the average cost value per line with a deviation is taken as ₺1,500: 128 × 1,500 = ₺192,000. When a check is done, the deviation is recorded with a report at the moment of receipt and the supplier is informed the same day; 90% of deviations are corrected with a completion of the shortage, a replacement or a credit note. With unchecked receipt, the deviation is noticed weeks later, usually through a customer complaint or a count, and the supplier does not accept responsibility; only 30% can be corrected.
- Cost value of lines with deviations (128 × ₺1,500)₺192,000
- Portion corrected by the supplier (90%)−₺172,800
- Net loss₺19,200
Prepared with sample values. Total: 192,000 − 172,800 = ₺19,200.
- Checked receipt₺19,200
- Unchecked receipt₺134,400
Prepared with sample values. Unchecked loss: 192,000 − (192,000 × 30% = 57,600) = ₺134,400.
The difference is 134,400 − 19,200 = ₺115,200; this figure is the money caught or missed at receipt every month. To deduct these receivables when planning payments to suppliers, see the article how to plan supplier payments. We explained how to match corrected items in supplier reconciliation in the article how to find and close account reconciliation differences.
Lesson 5: How is the goods receipt record kept?
In short: The accepted quantity enters inventory, the deviation is written in a separate record and the incoming invoice is compared with the accepted quantity.
- Purchase order: The order number, product, quantity and expected unit cost are recorded.
- Receipt record: The accepted quantity enters inventory; the unit cost is taken from the order. The waybill number and delivery date are written.
- Deviation record: Short, excess, damaged and wrong products are recorded on separate lines with the reason and a photo. A damaged product does not enter sales inventory; it waits in a separate area.
- Supplier notification: The deviation is reported the same day by email; the reply and the correction are added to the record.
- Invoice matching: The incoming invoice is compared with the accepted quantity; if there is a difference, a correction (a return invoice or credit note) is expected. For how to check incoming invoices, see the article how to record and check incoming invoices.
It is important that a damaged product does not enter sales inventory; the same logic applies to returned products and is explained in detail in the article how to take a returned product back into inventory. Recording the product at its purchase cost determines the accuracy of inventory value; you can read how the cost is formed in the article how to calculate inventory cost.
Lesson 6: How is a supplier-based deviation table built?
In short: Separate deviations by supplier. While the total rate looks like 8%, it can reach 20% for one supplier.
| Supplier | Shipping | Order line | Line with a deviation | Deviation rate |
|---|---|---|---|---|
| T1 | 30 | 600 | 18 | %3,0 |
| T2 | 25 | 500 | 22 | %4,4 |
| T3 | 15 | 300 | 48 | %16,0 |
| T4 | 10 | 200 | 40 | %20,0 |
| Total | 80 | 1.600 | 128 | %8,0 |
- T13.0%
- T24.4%
- T316.0%
- T420.0%
Prepared with sample values. Rate: lines with deviations ÷ order lines.
T3 and T4 ship only 31% of the lines (500 ÷ 1,600) but produce (48 + 40) ÷ 128 = 68.75% of the deviations. Talking to these two suppliers is more effective than widening the check: when deviation data is shown to the supplier, negotiating a correction or a price reduction becomes easier. Adjust the check accordingly: sampling for T1 and T2, a full count for T3 and T4. You can read how to use this data when choosing suppliers in the article how to measure supplier performance.
Lesson 7: What are the cost and timing of the check?
In short: The goods receipt check requires extra labor. In the example, its monthly cost is ₺9,600 and its benefit is ₺115,200.
In the sample business, the check requires an average of half an hour of extra work per shipment. If the employee's hourly cost is ₺240, the monthly cost is 80 shipments × 0.5 hours × ₺240 = ₺9,600. Since the difference the check creates is ₺115,200, the net benefit is 115,200 − 9,600 = ₺105,600; that is, every lira spent on the check returns about 12 liras (115,200 ÷ 9,600 = 12).
The timing rule is simple: receipt is done on the delivery day and the notification goes out the same day. In supplier contracts the objection period is usually short; read this period in the contract and track it on the calendar. A growing receipt queue during busy periods is also a risk. For receiving shipments that arrive during a busy campaign week, add the receipt plan to the preparation list in the article how to prepare for a busy campaign period. To limit the authority of the employee who does the receipt to record keeping and supplier notification, see the article how to set up user permissions.
Recommended readingHow Do You Measure Supplier Performance?Lesson 8: How is goods receipt monitored?
In short: In a monthly table, monitor the deviation rate, the deviation type, the supplier-based deviation, the correction rate and the receipt time.
| Indicator | How it is calculated | Sample value |
|---|---|---|
| Deviation rate | Lines with deviations ÷ Order lines | %8,0 |
| Short quantity share | Short quantity ÷ Lines with deviations | %50,0 |
| Correction rate | Value corrected by the supplier ÷ Deviation value | %90,0 |
| Net loss | Deviation value − Corrected value | 19.200 ₺ |
| Receipt time | Time between delivery and inventory entry | Target: same day |
- 8%share of lines with a deviation at goods receipt
- ₺192,000cost value of lines with deviations
- ₺115,200monthly difference the check creates
- 68.75%the two suppliers' share of deviations
In indicators, the direction matters more than a single month's value. If the deviation rate rises three months in a row, the problem is usually with a specific supplier or a specific product group; the supplier table shows the source right away. If the correction rate falls below 90%, it shows that receipt records are being kept incompletely or that notification is delayed. To bring the report to a management meeting, you can add the goods receipt row to the layout in the article how to prepare a weekly management report.
Recommended readingHow Do You Calculate the Cost of Manual Order Processing? Training on Step Times, Error Cost, Cost per Order, Automation Breakeven and Staffing NeedsWhat are the most common mistakes in goods receipt?
- Putting packages on shelves without opening them. Shortage and damage cannot be proven later.
- Trusting only the waybill. The quantity on the waybill does not guarantee the quantity that actually arrived.
- Not recording an excess product. An inventory difference arises and the invoice and inventory do not match.
- Taking a damaged product into sales inventory. A damaged product goes to the customer and a return follows.
- Notifying the supplier late. The objection period passes and no correction can be obtained.
- Not tracking by supplier. Two problem suppliers get lost in the total rate.
- Not comparing the invoice with the accepted quantity. You pay for a product that never arrived.
How does NetKasam make goods receipt tracking easier?
- Inventory movements. You see all inventory movements in detail and track the history of entries (inventory management).
- Incoming invoice tracking. You record invoices from suppliers and track their payments (invoice tracking).
- Customer and supplier account tracking. You track the supplier balance and correction records in the account (customer and supplier account tracking).
- Branch and warehouse-based inventory. You see which warehouse the incoming product entered (branch and warehouse management).
- Critical stock. By setting a critical stock quantity for your products, you see when to reorder.
- Saved reports. You save the monthly report and export it to Excel (reports).
- Bookkeeping is free. e-Invoice, customer and supplier accounts, inventory, cash, bank and expense management are free in every plan; see the pricing page for details.
Mini quiz: Test what you have learned
In short: Answer the 5 questions below, then compare with the answer key. 4 or 5 correct shows you have completed the training.
- If 128 of 1,600 order lines show a deviation, what is the deviation rate in percent?
- If each of the 128 lines with deviations is worth an average of ₺1,500, what is the total deviation value?
- If the deviation value is ₺192,000 and 90% of it is corrected, what is the net loss in ₺?
- If 48 of 300 lines from supplier T3 show a deviation, what is the deviation rate in percent?
- If there are 80 shipments, 0.5 hours per shipment and an hourly cost of ₺240, what is the monthly cost of the check?
Answer key:
- 128 ÷ 1.600 = %8.
- 128 × 1.500 = 192.000 ₺.
- 192.000 − 172.800 = 19.200 ₺.
- 48 ÷ 300 = %16.
- 80 × 0,5 × 240 = 9.600 ₺.
Frequently Asked Questions About Goods Receipt
What is goods receipt?
It is the checking step in which a product arriving from a supplier is compared with the order and waybill and verified for quantity, product and condition, and then enters inventory.
Why should goods receipt be done the same day?
If it is not done the same day, the evidence of deviation and the objection period are lost, it becomes unclear who caused the damage and getting a correction from the supplier becomes harder.
Which deviations appear in goods receipt?
Short quantity, excess quantity, damaged or defective product and wrong product. Which one dominates is tracked with a monthly table.
Is a full count needed for every shipment?
It is not. Sampling is used for reliable suppliers and a full count for problematic suppliers; if a deviation shows up in sampling, you move to a full count.
Does a damaged product enter sales inventory?
No. A damaged product waits in a separate area, is written into the deviation record and is reported to the supplier.
What do you do with an excess product?
It is recorded and reported to the supplier. If it is not recorded, an inventory difference arises and the supplier may later ask for it back.
How does an incoming invoice match the receipt record?
The quantity on the invoice is compared with the accepted quantity. If there is a difference, a return invoice or credit note is expected, and the payment is corrected with this record.
How often should goods receipt indicators be monitored?
A monthly table is enough; however, the receipt time and open deviation notices should be monitored weekly.
Conclusion: Let every package pass through a gate before it enters the warehouse
The most useful thing you can do today is to write the last month's supplier deliveries into a table by deviation type and calculate the deviation rate by supplier. The next step is to put the four-step check at receipt in writing, move to a full count for problem suppliers and report deviations the same day. Every lira spent on the check pays back from the first month.
Bookkeeping Is Now Completely Free